1.Get the full scope from the documents
- Finish plan and schedule: product, color, install pattern and direction for every room.
- Specifications: adhesive, moisture limits, testing, attic stock and warranty.
- Demolition plan: who removes the old floor, and who removes the old adhesive.
- Furniture and phasing: an occupied office done at night is a different job from an empty shell.
- Addenda: list the ones you priced in your bid.
In older buildings, resilient flooring and its adhesive can contain asbestos. Have suspect material tested before anyone disturbs it, and state in your bid that abatement isn’t included.
2.Take off each product in its own unit
- LVT, LVP and VCT: square feet, rounded up to cartons.
- Carpet tile: square feet or square yards, rounded up to cartons.
- Broadloom: square yards (9 sq ft each), from a seam plan based on the roll width.
- Base: linear feet minus door openings, plus corners.
- Transitions and reducers: linear feet, at every change of floor.
- Stairs: treads, risers and nosing, counted each.
3.Set waste by product and layout
Common starting points, before you look at the room shapes:
- Plank or tile, straight lay in open rooms: about 5–10%.
- Diagonal or patterned: about 10–15%.
- Broadloom: use the cut list, not a percentage. Pattern match and roll width decide it.
Large open areas waste less than corridors and small offices, so one percentage for the whole building is usually wrong somewhere. Order the full quantity at once when you can: a second order may come from a different dye lot.
4.Put a plan around the slab
The slab can be the biggest risk in the bid. ASTM F710 says concrete should be tested for moisture regardless of its age or grade level. With in-slab humidity probes under ASTM F2170, that means three tests for the first 1,000 sq ft and at least one more for each additional 1,000 sq ft, so a 10,000 sq ft floor takes 12.
Moisture limits come from the flooring and adhesive makers, so check both. Then say in your bid:
- who tests, who pays, and who acts on a failed result
- a unit price for moisture mitigation, per square foot
- how much patching is included, and a unit price for anything beyond it
5.Price the small materials
Adhesive, base adhesive, patch, primer, seam sealer and transitions are easy to lump into one allowance. Price them from the coverage on the product’s data sheet, using the trowel it calls for. Rough or porous concrete usually takes more.
6.Estimate labor in hours
Estimate hours by task and multiply by a loaded rate: wage plus payroll taxes, workers’ comp, liability insurance and benefits. Keep prep, install, base and cleanup as separate lines so you can compare them with the finished job. Watch for:
- small rooms, closets and lots of door frames
- moving furniture, night work and elevator-only access
- acclimation time, return trips and adhesive that has to flash off
- heat-welded seams, flash cove and stairs
7.Add overhead and profit
Divide a year of overhead by a year of direct job cost to get your overhead percentage, then add profit on top. Markup and margin are not the same number: a 25% markup on cost is a 20% margin on the price. To hit a 25% margin, divide cost by 0.75.
Worked example: office build-out
Every rate and coverage here is made up to show the method. Swap in your own quotes, hours and percentages.
- Labor$8,280.00
- Materials$16,799.40
- Freight and tax$1,387.96
- Overhead$3,176.08
- Profit$2,964.34
Materials
Measured quantity, plus waste, rounded up to what you order.
| Item | Cost |
|---|---|
| LVT plank, glue-down3,200 sq ft + 7% waste 3,424 sq ft × $2.85 | $9,758.40 |
| Carpet tile1,500 sq ft + 5% waste 1,575 sq ft × $2.60 | $4,095.00 |
| LVT adhesive3,200 sq ft + 5% waste 5 pails × $165.00 | $825.00 |
| Carpet tile adhesive1,500 sq ft + 5% waste 2 pails × $120.00 | $240.00 |
| Rubber base, 4″620 lin ft + 5% waste 6 cartons × $168.00 | $1,008.00 |
| Base adhesive620 lin ft + 5% waste 14 tubes × $9.00 | $126.00 |
| Transitions60 lin ft + 10% waste 66 lin ft × $5.50 | $363.00 |
| Patching compoundNo waste added 12 bags × $32.00 | $384.00 |
| Materials total | $16,799.40 |
Labor
Hours by task, at a $45.00 loaded rate.
| Task | Hours | Cost |
|---|---|---|
| Mobilize, protect, layout | 12 | $540.00 |
| Patch and skim | 24 | $1,080.00 |
| Install LVT | 80 | $3,600.00 |
| Install carpet tile | 24 | $1,080.00 |
| Base and transitions | 26 | $1,170.00 |
| Clean up and protect | 10 | $450.00 |
| Punch list and closeout | 8 | $360.00 |
| Labor total | 184 | $8,280.00 |
From cost to price
- Materials
- $16,799.40
- Freight
- $380.00
- Sales tax6% of materials
- $1,007.96
- Labor184 hours × $45.00
- $8,280.00
- Direct cost
- $26,467.36
- Overhead12% of direct cost
- $3,176.08
- Profit10% of cost plus overhead
- $2,964.34
- Bid price
- $32,607.78
The 12% and 10% markups together leave a 18.8% gross margin, and overhead is paid out of that. Sales tax rules for contractors vary by state, so confirm yours with your accountant.
BidPaid counts labor as part of your gross profit, because your crew is paid out of it. It shows a higher margin for this same bid.
8.Write inclusions and exclusions
Inclusions and exclusions
- Products, colors and areas, with the plan date and addenda you priced
- Demolition, adhesive removal, disposal and abatement
- Moisture testing, mitigation, patching and leveling
- Furniture moving and protection after you leave
- Initial cleaning, and finish or wax where the product needs it
- Attic stock, working hours and number of mobilizations
- Sales tax, freight, lead time and how long the price is good for
- Retainage and payment terms
9.Check it before you send it
- Every finish code on the schedule is priced or excluded.
- Product square feet add up to roughly the building’s floor area, minus other trades.
- Base linear feet look right for the number of rooms.
- Quotes are current and include freight.
- Unit prices for prep and mitigation are written in the bid.
Sources
- WJE on ASTM F710 (preparing concrete for resilient flooring)
- Wagner Meters on ASTM F2170 (number of moisture tests)